Grounding Conductor Calculator for Maryland

NEC 2020 grounding conductor math for EV charger installers working in Maryland.

EGC sizing in Maryland follows NEC 2020 Table 250.122, indexed off the upstream OCPD rating, with parallel rules for parallel sets and increased-conductor adjustments under 250.122(B).

Worked example for Maryland

For a 40 A EVSE branch, Table 250.122 calls for a minimum #10 Cu equipment grounding conductor. If you upsize the phase conductors for voltage drop in Maryland's long runs, NEC 250.122(B) requires the EGC to be upsized proportionally.

Code & Utilities

EV installations in Maryland are governed by the 2020 National Electrical Code, in force since 2022. That includes Article 625 (Electric Vehicle Power Transfer System) requirements: 125% continuous-load sizing on EVSE branch circuits, GFCI protection at outdoor receptacles, and provisions for energy management systems on shared circuits.

In Maryland, you'll most often interconnect with BGE, Pepco, Delmarva Power, Potomac Edison. Always verify the applicable tariff and any utility-specific requirements (CT cabinets, metering enclosures, demand limiters) at design time.

Climate & Ampacity

In Maryland, the 91°F summer ambient drives a 0.88× 75°C ampacity correction. Bake this into every Level 2 and DCFC conductor pick before you commit to a wire size. Because the correction is below 0.9, conductors that "look fine" on a 30°C ampacity table will not carry their nameplate current here — always derate explicitly.

Maryland takeaway

On DCFC sites with parallel feeder sets, each parallel raceway needs its own full-size EGC — a detail inspectors in Maryland catch frequently on commercial submittals.