Worked example for North Dakota
A 4-11/16" square × 2-1/8" deep box has a 42.0 in³ volume. Each #6 Cu conductor counts as 5.0 in³. With a 2-conductor + EGC EVSE branch landing in the box plus a device, you consume roughly 15-20 in³, leaving plenty of headroom — but a 60 A multi-port pull box can fill quickly with #4 or #2 AWG conductors.
Code & Utilities
EV installations in North Dakota are governed by the 2020 National Electrical Code, in force since 2023. That includes Article 625 (Electric Vehicle Power Transfer System) requirements: 125% continuous-load sizing on EVSE branch circuits, GFCI protection at outdoor receptacles, and provisions for energy management systems on shared circuits.
In North Dakota, you'll most often interconnect with Xcel Energy North Dakota, Otter Tail Power, Montana-Dakota Utilities. Each has its own service-upgrade timeline, EV rebate availability, and metering rules — confirm them before quoting commercial work.
Climate & Ampacity
North Dakota's representative summer design ambient is around 91°F, which yields a 0.88× ampacity correction factor at 75°C terminations per NEC 310.15(B)(1). Because the correction is below 0.9, conductors that "look fine" on a 30°C ampacity table will not carry their nameplate current here — always derate explicitly.