Box Fill Calculator for Georgia

NEC 2020 box fill math for EV charger installers working in Georgia.

Every EVSE installation in Georgia eventually hits a junction or device box — disconnects, splice points, pull boxes — all of which must satisfy NEC 2020 Article 314.16 fill rules.

Worked example for Georgia

A 4-11/16" square × 2-1/8" deep box has a 42.0 in³ volume. Each #6 Cu conductor counts as 5.0 in³. With a 2-conductor + EGC EVSE branch landing in the box plus a device, you consume roughly 15-20 in³, leaving plenty of headroom — but a 60 A multi-port pull box can fill quickly with #4 or #2 AWG conductors.

Code & Utilities

Georgia currently enforces the NEC 2020 edition, adopted in 2021. That includes Article 625 (Electric Vehicle Power Transfer System) requirements: 125% continuous-load sizing on EVSE branch circuits, GFCI protection at outdoor receptacles, and provisions for energy management systems on shared circuits.

Georgia's primary EV-relevant utilities are Georgia Power, Oglethorpe Power, MEAG Power. Always verify the applicable tariff and any utility-specific requirements (CT cabinets, metering enclosures, demand limiters) at design time.

Climate & Ampacity

In Georgia, the 94°F summer ambient drives a 0.88× 75°C ampacity correction. Bake this into every Level 2 and DCFC conductor pick before you commit to a wire size. Because the correction is below 0.9, conductors that "look fine" on a 30°C ampacity table will not carry their nameplate current here — always derate explicitly.

Georgia takeaway

Always run box-fill math when the EVSE disconnect lives more than a few inches from the unit itself — that intermediate junction is where Georgia inspectors most often catch fill violations.